Potable Water Supply System For The Municipality of Candijay Bohol
This is the on-going project of Myriad Water in Bohol. Below are the details of the project and more.
5/8/2024


PHASE 1 DPWH PROJECT
Click the pictures to enlarge the images
• INTAKE STRUCTURE
• 8” PIPELINE (3060m)
• FILTRATION BUILDING (LUAN)
• FILTRATION BUILDING (CADAPDAPAN)
• FILTRATION BUILDING (CAN-OLIN)
• PUMPING SYSTEM CADAPDAPAN (30HP)
• ELECTRICAL SYSTE
PHASE 2 DPWH PROJECT
Click the pictures to enlarge the images
• COBSTRUCTION OF SEDIMENTATION BASIN
• SLOPE PROTECTION
• 8” PIPELINE (6,000m)
• FLOW MEASUREMENT DEVICES
• INSTALLATION OF INTERCONNECTION
ADDITIONAL WORKS FUNDED BY MAYOR
• Solar system for pump.
• Installation of new pump and control for Upper and Lower Luan.
• 4” PIPELINE from Sapa Spring to pump.
• Installation of intake structure for pumping system in Upper Luan.
• Installation of Filtration System for Upper and Lower Luan.
• Installation of Concrete Pad for the Filtration System.
• Installation of 30hp Vertical Turbine Pump and 5hp Sewage Pump in
Click the pictures to enlarge the images
FUTURE WATER SYSTEM DEVELOPMENT
• Development of Water Impounding in barangay Luan.
Holding Capacity: 10,000 cubic meter. Area: 2500 sqm Water Deep: 4m Average
• Development of Can-olin Spring to supply additional potable water in Poblacion, Tawid, Tugas, Can-olin, and Cogtong.
• Development of Cogtong Spring to provide water for barangay Cogtong.
• Development of water park for eco tourism located in Luan adjacent to sedimentation.